This development will be two office buildings around an internal courtyard, rising to nine storeys and covering a total of 135,000 sq ft.
Many of the deliverables (3.)could be sequenced traditionally and could be tracked.

The trick was that as far as possible they should be de-linked from Integration Strategy E.g.the fundamentals of a process P&ID or a Functional Specification are not linked to the scale of the process or its capacity..The coordination of key interactions (4.)

was vital to have the full integrated design.Including discussions/reviews with the client, conversations, and formal RFQ with supply chain.

If done with thoughtfulness they could help lubricate and develop the thinking, rather than creating disruptive re-work.
The difference between iteration and re-work needed to be understood..For example, Dr. Tom Beach at Cardiff University has been funded through one of the projects, with significant scholarly interest in his research on digital compliance checking.
As a result of a link fostered by TCN+ with the Construction Innovation Hub, The Hub is now supporting Dr. Beach with some of his leading work.Due to the sheer number of stakeholders involved in supporting these projects, the researchers are frequently making organic connections as they go along.
These include representatives from Tier 1 contractors, housing and healthcare companies, as well as other research bodies like the Manufacturing Technology Centre (MTC).This is all adding to the excitement.. Research acceleration due to COVID-19.